International Applied Engineering Inc. has a wide range of clients in the pulp
and paper and power industry. Below is a list of projects from 1982 to present.
A more detailed description of projects
is available for download here in PDF
Format ![]()
| Open | 2000-Present | 1995-1999 | 1990-1994 | 1982-1989 | Top |
| Client | Project Description | Start | Completion |
| Unicoi Energy Services S5033 |
Green Power – Availability and efficiency, and recommendation for green capacity improvements | 12/02 | OPEN |
| Green Bay Packaging C2062\010 |
NOx Reduction – Evaluate, performance tuning, and provide recommendations for future low NOx operations | 07/03 | OPEN |
| Indeck Maine Energy C2078\004 |
Boiler assessment on (2) CFB modification projects, recommendations for improvements and budget estimates | 07/03 | OPEN |
| WC Johnsonburg C2074\003 |
RBESTTM phase 2 – Owner’s engineer for modified over fire air systems modifications, training of operations and start up | 07/02 | OPEN |
| NGP Power Corp C2091\B02 |
Lyonsdale assessment - Determine the upgrades needed for Improved output and efficiency of the plant | 06/03 | OPEN |
| AOE 4 for Wellons C2072\006 |
Provide continuing PBESTTM engineering support for the WII biomass power boiler at Hawesville, KY | 06/02 | OPEN |
| Industrias Centauro Proposal S5032 |
Durango, Mexico – Owner’s engineer for modification of recovery boiler to combust with waste biomass | 06/02 | OPEN |
| FeedForward, Inc. C2092\001 |
Detroit Thermal - Burner management and combustion control systems upgrade for district heating plant | 05/03 | OPEN |
| NGP Power Corp C2091\B01 |
Preliminary assessment of a 55 MW biomass power project and recommendations for improvements | 05/03 | OPEN |
| AOE 4 for Wellons C2072\005 |
Provide continuing RBESTTM engineering services for WC recovery boiler | 05/02 | OPEN |
| Greenbelt Energy C2089\B01 |
Port St James – Owner’s engineer for 30 MW green field biomass power plant development | 04/03 | OPEN |
| Genesis C2079\004 |
Consultancy services –Comprehensive assessment of 350000 lb/hr wood and natural gas fire boiler to respond to legal statement of claims | 04/02 | OPEN |
| Verdant Energy Ltd C2088\001 |
Engineering support for CFB modifications to BFB | 03/03 | OPEN |
| Weyerhaeuser Company C2073\002 |
NOx reduction – Evaluate, performance tuning, and provide recommendations to improve NOx generation in future operations | 02/03 | OPEN |
| McCarthy Family Farms C2086\B01 |
Liberty I and III support to retrofit existing plants to use biosolids and green waste as fuel sources | 01/03 | OPEN |
| AOE 4 for Wellons C2072\003 |
Provide continuing PBESTTM engineering support for the WC biomass power boiler at Bennettsville, SC | 01/01 | OPEN |
| AOE 4 for Wellons C2072\002 |
Provide continuing PBESTTM engineering support for the WII biomass power boiler at Port Wentworth, GA | 10/00 | OPEN |
AOE 4 for Wellons C2072\004 |
Provide continuing “RBESTTM” engineering support for the WII black liquor recovery boiler at Bennettsville, SC | 08/00 | OPEN |
| AOE 4 for Wellons C2072\001 |
Provide continuing PBESTTM engineering support for the WII biomass power boiler at Campti, LA | 02/00 | OPEN |
| Jefferson Smurfit Corp. C2069\005 |
Perform re-certification test for wood waste gasification system | 02/00 | OPEN |
| ECOTRADE C2052\005 |
TDA feasibility study to build small biomass CHP plants in Russia to replace diesel fueled generation | 10/99 | OPEN |
| Electric Resource Group C2028\003 |
VDMF – Coal fired boiler power generation project for modularized coal fired power plants | 08/97 | OPEN |
| Electric Resource Group C2028\002 |
MEI-XI-FA, China – CFB coal fired CHP project for 300MW of generation | 02/97 | HOLD |
| Open | 2000-Present | 1995-1999 | 1990-1994 | 1982-1989 | Top |
| Client | Project Description | Start | Completion |
| WC Marlboro C2084\001 |
CFD modeling of BLRB, analysis and recommendations for boiler modifications | 12/02 | 01/03 |
| Genesis C2079\002 |
Biomass fuel data collection, assessment and boiler operations evaluation | 12/01 | 04/02 |
| Genesis C2079\001 |
Preliminary assessment of boiler performance and report with recommended operational improvements | 11/01 | 02/02 |
| Boiler Tube of America C2085\001 |
Design of new S/H for 300 MW utility boiler | 10/02 | 11/02 |
| Indeck Maine Energy C2078\001 |
Expert testimony of technology and assessment of the environmental impacts | 10/01 | 02/02 |
| MRW Mexicana C2075\001 |
Support services for boiler design and project cost estimates | 08/01 | 09/01 |
| Tucson Electric C2076\001 |
Investigate private power market in Honduras | 08/01 | 10/01 |
| Green Bay Packaging C2062\009 |
2002 recertification test | 07/02 | 12/02 |
| Industrias Centauro C2083\001 |
Fuel testing, inspection and evaluation of boiler systems | 07/02 | 01/03 |
| Omar Zevallos C2082\002 |
TTP cost estimate and design review of geo-thermo plant | 05/02 | 11/02 |
| Green Bay Packaging C2062\008 |
2001 recertification test | 05/01 | 11/01 |
| WC Johnsonburg C2074\001 |
BLRB – Boiler assessment and CFD model analysis | 05/01 | 12/01 |
| Indeck Maine Energy C2078\003 |
BFB trials - Boiler tuning | 04/03 | 06/03 |
| Willamette Industries, Inc. C2059\010 |
Campti, LA- Training & certification test | 04/01 | 01/02 |
| McCarthy Family Farms C2086\005 |
Liberty I and III boiler pressure parts non-destructive testing evaluation and recommendations for repairs | 03/03 | 05/03 |
| Western Industrial Clay Products C2090\B01 |
Analysis of drying Kiln alternatives for biomass and coal fuels, feasibility study and recommendations for proceeding | 03/03 | 05/03 |
| NETL C2081\001 |
Black liquor gasification evaluation | 03/02 | 06/02 |
| WC Johnsonburg C2074\002 |
RBEST – Boiler upgrade, phase I application and testing | 03/02 | 04/02 |
| InterState Paper C2087\001 |
Due diligence for boiler purchase and selection of implementation team | 02/03 | 05/03 |
| Indeck Maine Energy C2078\002 |
Ongoing support – Boiler assessment and tuning, environmental impact of emissions and regional comparisons | 02/02 | 04/02 |
| Willamette Industries, Inc. C2070\004 |
Evaluate flue gas re-circulation. Design, fabricate and support Venturi duct section installation. | 02/01 | 06/01 |
| McCarthy Family Farms C2086\001 |
Liberty I and III assessments of installation requirements for operational improvement | 01/03 | 06/03 |
| McCarthy Family Farms C2086\002 |
Liberty I and III section 29, fuel analysis and applications, cost impact assessment | 01/03 | 06/03 |
| McCarthy Family Farms C2086\003 |
Liberty I and III green power applications and impacts | 01/03 | 06/03 |
| McCarthy Family Farms C2086\004 |
Liberty I and III materials handling systems for wood and bio-solids – preliminary design and cost estimates | 01/03 | 03/03 |
| Omar Zevallos C2082\001 |
TTP review of specifications for geo-thermo plant | 01/02 | 01/02 |
| Willamette Industries, Inc. C2070\003 |
Hawesville, KY - resolved boiler pressure excursion problem | 01/01 | 03/01 |
| Willamette Industries, Inc. C2059\009 |
Hawesville, KY - BLRB operation & boiler tuning | 11/00 | 05/01 |
| Green Bay Packaging C2062\007 |
Boiler evaluation and recommendations | 10/00 | 12/00 |
| Willamette Industries, Inc. C2059\008 |
Port Wentworth, GA - Boiler control evaluation & modification | 09/00 | 09/01 |
| Willamette Industries, Inc. C2073\001 |
Evaluate and provide controls tuning for biomass power boiler | 07/00 | 09/01 |
| Willamette Industries, Inc. C2059\007 |
Campti, LA - PWRB combustion air modifications and gasification operation recommendations and cost estimates | 06/00 | 12/00 |
| Willamette Industries, Inc. C2070\002 |
Black liquor recovery boiler tuning | 03/00 | 8/00 |
| Sanderson & Rotroff C2071\002 |
Green Bay packaging co. – IRC section 29 technical review and recommendations | 03/00 | 09/00 |
| Sutton Lumber Company C2010\008 |
Power purchase agreement with biomass plant optimization | 02/00 | 06/00 |
| Willamette Industries, Inc. C2059\006 |
Gasification assessment program. Cost assessment for gasification of multiple power and recovery boilers. | 02/00 | 09/00 |
| Sanderson & Rotroff C2071\001 |
Green Bay packaging co. | 02/00 | 09/00 |
| WII Hawesville, KY Mill C2070\001 |
Boiler fluidized bed – Performance tuning | 01/00 | 03/00 |
| Open | 2000-Present | 1995-1999 | 1990-1994 | 1982-1989 | Top |
| Client | Project Description | Start | Completion |
| Green Bay Packaging C2062\006 |
Re-certification test & report | 09/99 | 03/00 |
| Jefferson Smurfit Corp. C2069\003 |
Certification test | 07/99 | 02/00 |
| Willamette Industries, Inc. C2070\001 |
Power boiler tuning | 06/99 | 08/00 |
| Jefferson Smurfit Corp. C2069\004 |
Air system design | 05/99 | 10/00 |
| Community Power Corp. C2060\002 |
Small modular biopower system | 04/99 | 08/99 |
| Jefferson Smurfit Corp. C2069\004 |
Recommend modification for improved performance of gasifier/boiler | 03/99 | 10/00 |
| IDM Energy Corp. C2064\005 |
Client rep in rep of Georgia on hydroelectric project applications | 02/99 | 08/99 |
| Oak Ridge National Laboratory C2032\002 |
Create database for biomass fuel characterization | 09/98 | 03/99 |
| Green Bay Packaging C2062\005 |
Certification test report | 07/98 | 10/99 |
| Graham Lumber Co. C2065\005 |
Certification report | 06/98 | 07/98 |
| Electric Resource Group C2028\004 |
Micronized coal modular power plant | 04/98 | 10/98 |
| Electric Resource Group C2028\003 |
5 MW fluidized bed coal fired – Modular power plant | 4/98 | 09/98 |
| Willamette Industries, Inc. C2059\005 |
Hawesville, KY recovery boiler/gasifier – Certification testing | 03/98 | 10/00 |
| Jefferson Smurfit Corp. C2069\003 |
Perform certification test for wood waste gasification system | 03/98 | 12/99 |
| Jefferson Smurfit Corp. C2069\002 |
Provide technical support for “placed in service” operator training, procedure manual, startup support, and performance. | 03/98 | 04/99 |
| Willamette Industries, Inc. C2059\004 |
Kingsport, TN hog fuel boiler/gasifier – Certification testing | 03/98 | 03/99 |
| Willamette Industries, Inc. C2059\003 |
Hawesville, KY hog fuel boiler/gasifier – Certification testing | 03/98 | 02/99 |
| Jefferson Smurfit Corp. C2069\001 |
Identify physical boundary condition of gasifier along with pro-forma calculations | 03/98 | 12/98 |
| Jefferson Smurfit Corp. C2069\002 |
Maximize #10 boiler/gasifier performance | 03/98 | 10/98 |
| Industra Corporation C2068\002 |
Modify biomass boiler at SNC for gasification (PRO-FORMA) | 03/98 | 09/98 |
| Industra Corporation C2068\001 |
Gasification certification – Physical boiler boundaries | 02/98 | 03/98 |
| Woodcraft Industries C2058\003 |
Certification – Obtain tax credits | 02/98 | 03/98 |
| Industra Service Corporation C2068\002 |
Smurfit #10 Boiler/gasifier “placed in service” | 01/98 | 10/98 |
| IDM Energy Corp. C2064\004 |
El Salvador – O&M RFQ | 01/98 | 04/98 |
| ECOTRADE C2052\002 |
North Russia prefeasibility | 12/97 | 01/99 |
| ECOTRADE, Inc. C2052\004 |
Biomass studies – Reports | 12/97 | 12/98 |
| Willamette Industries, Inc. C2059\002 |
Evaluate and predict performance of the bubbling fluidized bed boiler and provide “placed in service” requirements. | 12/97 | 08/98 |
| Graham Lumber Co. C2065\004 |
PLC controls – Retrofit | 12/97 | 06/98 |
| IDM Energy Corp. C2064\003 |
El Salvador – Diesel spec for 150 MW gauge mounted application | 12/97 | 02/98 |
| Green Bay Packaging C2062\002 |
Gasification certification review | 11/97 | 05/98 |
| Pacific NW National Labs C2067\001 |
Chernoble site, assessment & report for waste wood power and mitigation of nuclear radiation | 11/97 | 05/98 |
| IDM Energy Corp. C2064\002 |
Proforma for application of MSW plant | 10/97 | 01/98 |
| Willamette Industries, Inc. C2059\001 |
Provide quantitative review and assessment of the technical and commercial proposals of four potential gasification equipment suppliers. | 10/97 | 12/97 |
| Graham Lumber Co. C2065\003 |
Boiler conversion to gasification, repair capacity deficiencies, and operator training | 09/97 | 04/98 |
| Milleville Lumber Company C2066\001 |
Gasification certification | 09/97 | 11/97 |
| Green Bay Packaging C2062\004 |
Boiler optimization design and specifications | 07/97 | 08/99 |
| Graham Lumber Co. C2065\002 |
Retrofit of boiler systems to gasification operations | 07/97 | 03/98 |
| Graham Lumber Co. C2065\001 |
Gasification problems and feasibility study | 04/97 | 06/97 |
| IDM Environmental Corp. C2064\001 |
MSW study | 03/97 | 04/97 |
| Green Bay Packaging C2062\003 |
Bark boiler conversion to gasification operations | 02/97 | 06/98 |
| Wood Mizer Products C2057\001 |
Stirling engines design and applications | 01/97 | 12/97 |
| Community Power Corp. C2060\001 |
Support CPC under NASDA grant for small renewable energy in Indonesia | 11/96 | 12/97 |
| CHIPTEC C2061\001 |
Gasification certification | 11/96 | 11/97 |
| Green Bay Packaging C2062\001 |
Gasification problems | 11/96 | 11/97 |
| Woodcraft Industries C2058\002 |
Modify two biomass boilers at two different sites for gasification operation | 11/96 | 07/97 |
| Nations Energy Corporation C2049\007 |
Turbine – Generator evaluation | 11/96 | 05/96 |
| Woodcraft Industries C2058\001 |
Evaluate & reconfigure systems for gasification operations | 10/96 | 03/98 |
| FRAI – ECOTRADE, Inc. C2056\001 |
Belarus biomass to energy / prefeasibility | 08/96 | 03/99 |
| Agripower, Inc. C2055\001 |
Commercialization venture program prop. | 08/96 | 10/97 |
| Weyerhauser Company C2053\002 |
Compliance with IRC 29 tax credit requirements and certification testing | 07/96 | 10/96 |
| Tennessee Valley Authority C2054\001 |
Human factors/control room evaluation | 07/96 | 08/96 |
| Oak Petroleum C2054\001 |
Misc. support for coal fired plant | 06/96 | 06/96 |
| Nations Energy Corporation C2049\008 |
Fuel protocol Guaimaca & Saba | 05/96 | 11/96 |
| Nations Energy Corporation C2049\009 |
Steam electric facilities | 05/96 | 10/96 |
| Nations Energy Corporation C2049\006 |
Honduras biomass power plant | 04/96 | 03/97 |
| Weyerhauser Company C2053\001 |
Gasification due dilligence | 01/96 | 12/96 |
| ECOTRADE C2052\003 |
ALASKA – Biomass energy | 12/95 | 12/97 |
| ECOTRADE C2052\001 |
Rural elect. waste biomass – Report | 12/95 | 06/96 |
| Southern Company Services C2041\001 |
Review ABB turbo chargers and power turbines and PGI proposed systems | 11/95 | 05/97 |
| Camden Iron & Metal C2021\002 |
Testing of ASR and evaluation of results | 11/95 | 03/96 |
| Harbert Power Corporation C2048\004 |
Stone forest products / Costa Rico power projects | 11/95 | 01/96 |
| Southern Company Services C2041\001 |
Condition Assessment study - Chevron Co-generation facility Pascasgoula, MS 150 MW gas turbine/HRSG system. | 11/95 | 01/96 |
| Nations Energy Corporation C2049\005 |
Permitting, final design and owners engineering support of three 15 MW biomass fueled power plants in Honduras, C.A. | 09/95 | 01/97 |
| Stone Container Corporation C2043\003 |
Assist in Costa Rica project to design 10 MW power plant for cogeneration | 09/95 | 12/95 |
| Nations Energy Corporation C2049\004 |
Fuel analysis, processing, and material handling for African Palm biomass fuels | 09/95 | 10/95 |
| United Wood Treating Co. C2051\001 |
Gasification certification for 5 MW wood fired power plant | 08/95 | 12/95 |
| Harbert Power Corporation C2048\003 |
Design review and support for power plant design and feasibility study | 08/95 | 11/95 |
| Nations Energy Corporation C2049\003 |
Review of bidders and selection of EPC, provider for (3) 15 MW power plants | 08/95 | 10/95 |
| Nations Energy Corporation C2049\002 |
Siting and PPA support and specifications and initial design of 15 MW power plant | 07/95 | 08/95 |
| Nations Energy Corporation C2049\001 |
Preliminary design and feasibility study of wood fueled power plant applications | 06/95 | 07/95 |
| Sandia Laboratory C2047\001 |
DOE engineering support for biomass energy applications | 04/95 | 11/97 |
| Harbert Power Corporation C2048\002 |
Misc. support service comments on gasification systems and coal ash beneficiation feasibility | 04/95 | 12/95 |
| NBIA C2018\006 |
Report - Offshore renewable energy (biomass, wind, solar) projects for the Pacific Islands | 03/95 | 03/97 |
| Co-Generation Associates C2046\001 |
Tire derived fuel and circulating fluidized bed feasibility study and preliminary design | 03/95 | 10/95 |
| North Carolina Dept Of Energy C2045\001 |
Due diligence on engineering for 1 MW wood fueled gasification demonstration power plant at Camp LeJuene. | 02/95 | 03/00 |
| Energy Division C2045\001 |
Biomass gasification and power generation with reciprocating engines | 02/95 | 06/98 |
| Stone Container Corporation C2043\002 |
Waste biomass fueled power plant | 02/95 | 12/95 |
| Continental Power. Co C2038\001 |
Barge mounted 70 MW combined cycle power station, preliminary design and feasibility review | 02/95 | 10/95 |
| Stone Container Corporation C2043\001 |
Prefeasibility assessment. Biomass fueled power plant in Honduras, C.A. | 02/95 | 06/95 |
| Griffin Lumber Company C2044\001 |
Gasification certification | 02/95 | 05/95 |
| Polk Power C2042\001 |
Due diligence review of operation problems at 120MW combined cycle co-generation facility. | 01/95 | 02/95 |
| Polk Power C2042\001 |
Review of repairs to GE 7EA gas turbine generator | 01/95 | 02/95 |
|   |
| Open | 2000-Present | 1995-1999 | 1990-1994 | 1982-1989 | Top |
| Client | Project Description | Start | Completion |
| Research Triangle Institute C2040\001 |
Consultation biomass waste energy system at Camp Lejune, SC | 12/94 | 01/95 |
| Continental Power Corporation C2038\002 |
Honduras combine cycle & systems & design | 11/94 | 9/96 |
| Western Ash Company C2039\001 |
Misc. support services & design | 11/94 | 12/95 |
| DRNA C2036\001 |
Puerto Rica – consulting contract | 10/94 | 04/95 |
| Cratech C2037\001 |
Low BTU gas combustor | 10/94 | 11/94 |
| ORNL C2032\001 |
Armenian bioenergy | 09/94 | 11/94 |
| VOCA C2035\001 |
Armenian bioenergy expenses | 09/94 | 10/94 |
| Energeo C2031\002 |
El Comandante specifications | 08/94 | 08/94 |
| ICS C2033\001 |
Mexican presentation expenses only | 08/94 | 08/94 |
| Sutton Lumber Company C2010\006 |
Misc. support for 2 MW wood fueled power project | 07/94 | 12/99 |
| SCI for IFREE C2029\001 |
Honduras MDO project | 07/94 | 06/95 |
| Energeo C2031\001 |
Project support | 07/94 | 05/95 |
| Stirling Thermal Motors C2030\002 |
Performance specifications | 07/94 | 04/95 |
| Stirling Thermal Motors C2030\003 |
Gasifier testing | 07/94 | 03/95 |
| Stirling Thermal Motors C2030\001 |
Support services to complete preliminary technical and commercial review of potential gasifier supplier. | 07/94 | 01/95 |
| RETI C2027\002 |
Virginia training program | 07/94 | 08/94 |
| Electric Resource Group C2028\001 |
Jaxor, Philippines | 06/94 | 12/97 |
| US/ECRE C2009\008 |
CORRECT-DOC Misc. Pacific Islands | 06/94 | 10/97 |
| JaxtorC2028\001 | Philippines 120 MW FBC coal plant | 06/94 | 11/95 |
| Harbert Power Corporation C2048\001 |
(Sm bio comp.) | 06/94 | 05/95 |
| GEKA Inc. C2026\001 |
Equipment review | 06/94 | 07/94 |
| RETI / REIA C2027\001 |
Training program | 06/94 | 07/94 |
| IFREE C2011\003 |
Costa Rica, AEG | 05/94 | 01/96 |
| SPI C2008\004 |
Support for WTE ash cleanup | 05/94 | 09/94 |
| SEIA C2025\001 |
Guyana, DR trips | 05/94 | 08/94 |
| US/ECRE C2009\00007 |
CORRECT-NREL DCA. Samoa | 03/94 | 06/97 |
| The Cook Islands Government C2024\001 |
Pre-feasibility study of the use of biomass and refuse to supply fuel to be used to generate electricity, commercial use. | 03/94 | 12/94 |
| TDA C2024\001 |
Cook Islands waste characterization | 03/94 | 06/94 |
| NWEA C2018\005 |
Deposits report | 02/94 | 02/95 |
| NREL C2023\001 |
Costa Rica rice burner | 02/94 | 04/94 |
| Southern Company Services C2041\001 |
Consulting relative to power generation systems. | 01/94 | 05/97 |
| IFREE C2011\002 |
Engineering consulting services | 01/94 | 03/94 |
| MEAG C2022\001 |
Cartersville electric, Hubbard milling | 01/94 | 02/94 |
| SPI C2008\003 |
ASR fuel program, phase III | 12/93 | 06/94 |
| Camden Iron & Metal C2021\001 |
ASR program ID | 11/93 | 12/95 |
| Sutton Lumber Company C2010\005 |
TG support 1 | 11/93 | 02/94 |
| US/ECRE C2009\006 |
CORRECT-Exp, Jakarta, Indonesia | 10/93 | 01/94 |
| Sutton Lumber Company C2010\007 |
Energeo, phase I | 09/93 | 09/97 |
| Environmental. & Minerals Consulting Corp. C2020\001 |
Louisville, KY inspect lime waste | 09/93 | 11/93 |
| NWEA C2018\002 |
Jamaica/DR project ID | 08/93 | 11/96 |
| Sutton Lumber Company C2010\004 |
Contracts | 08/93 | 08/96 |
| Sutton Lumber Company C2010\002 |
Owner engineer for fluidized bed wood waste fired Energeo demonstration facility powering a gas turbine generator. | 08/93 | 05/94 |
| NWEA C2018\003 |
Virgin Islands E4 conference | 08/93 | 11/93 |
| Sutton Lumber Company C2010\003 |
TG search | 08/93 | 11/93 |
| Heller Financial, Inc. C2017\001 |
EEI, 2 plants | 06/93 | 09/93 |
| NWEA C2018\001 |
Exp testimony (ways & means) | 06/93 | 08/93 |
| Environmental Compliance,Inc. C2015\001 |
Environmental compliance services, inc. | 05/93 | 02/94 |
| US/ECRE C2009\005 |
Exp, CIG & PBC meet | 05/93 | 09/93 |
| US/ECRE C2009\004 |
Exp, Pac Guam Saipan | 04/93 | 09/93 |
| Energy of Ohio C2013\001 |
Tire to energy plant | 03/93 | 06/94 |
| US/ECRE C2009\003 |
Soltech activities and support | 03/93 | 09/93 |
| SERBEP C2012\001 |
TVA expenses advisory board | 02/93 | 04/93 |
| US/ECRE C2009\002 |
US Solomon Island biomass applications | 01/93 | 04/93 |
| Sutton Lumber Company C2010\001 |
Feasibility study for the cogeneration of electric power from sawmill by products | 12/92 | 11/93 |
| Intercontinental Waste Mgt. C2006\002 |
Evaluation of landfill and monofill options | 12/92 | 09/93 |
| Undisclosed Private Client | Evaluation of purchase of a $20 + - million landfill permit/construction project in the midwest. | 12/92 | 09/93 |
James Gribben Associates C2005\001 |
Tire burning plant feasibility study and preliminary engineering | 12/92 | 02/93 |
| IFREE C2011\001 |
Cook Islands, pre-feasibility study | 11/92 | 06/93 |
| Chrysler Capital Corp. CTC2007\002 |
Due diligence services for SPI Heller financial | 10/92 | 12/92 |
| SPI C2008\002 |
ASR fuel program, phase II | 09/92 | 02/94 |
| Fichtner Engineering, Inc. C2000\003 |
Continuation of city of Atlanta solid waste management plan | 09/92 | 09/93 |
| Fichtner Engineering, Inc. C2000\002 |
Chrysler capital | 09/92 | 09/93 |
| Fichtner Engineering, Inc. C2000\001 |
Stuttgart, Germany | 09/92 | 08/93 |
| Chrysler Capital Corp. C2007\001 |
Doswell, Virginia 600 MW gas fired combined cycle power plant. Review of project design and construction. | 09/92 | 12/92 |
| REM, Inc. C2004\001 |
Design of steam turbine and electric generation for steel mill. | 09/92 | 11/92 |
Lempres & Wulfsberg C2003\001 |
Professional engineering services for root cause determination | 07/92 | 07/94 |
| SPI C2008\001 |
Savannah Processing, Inc. | 07/92 | 01/94 |
| Undisclosed Private Client | Investigation of environmental and economic aspects of the use of reclaimed fluff from scrap automobiles as a boiler fuel. | 07/92 | 01/94 |
| Cook CountyAdel GA | Examine the operation and expansion of the Cook County (Taylor Road) landfill. Designed groundwater-monitoring | 07/92 | 09/93 |
| US/ECRE C2009\001 |
Report on the feasibility of application of renewable energy and energy efficiency in the South Pacific Islands. | 07/92 | 12/92 |
| Undisclosed Private Client | Evaluation of a whole tire combustion project to dispose of scrap tires and generate steam and electrical energy. | 05/92 | 02/93 |
| Undisclosed Private Client | Evaluation of a monofill for storage of tires prior to recovery of combustion. | 04/92 | 12/92 |
| Intercontinental Waste Mgt. C2006\001 |
Feasibility studies for solid waste management and the monofills | 04/92 | 12/92 |
| PIC Power | 250 MW gas fired combined cycle cogeneration plant. Represent Owner during meetings and conceptual design | 11/91 | 04/93 |
| US DOE, International Fund | Cook Islands pre-feasibility Study for 2.5 MW biomass and RDF fueled power plant. | 11/91 | 01/93 |
| City of Atlanta | Solid waste composition study | 10/91 | 12/93 |
| Westmoreland EnergyCharlottesville, VA | 120 MW gas fired combined cycle cogeneration plant. Conceptual design and EPC cost estimate. | 09/91 | 06/92 |
| Butts CountyJackson, GA | Landfill investigations. Supply data to enable the county to select a suitable solid waste management site. | 09/91 | 01/92 |
| City of AtlantaAtlanta, GA | Drafting of the city's solid waste management plan, including waste characterization, recycling, and waste to energy studies. | 07/91 | 03/94 |
| Butts County Jackson, GA | Landfill siting study, regional landfill feasibility consulting. | 03/91 | 11/92 |
| RCA/Sithe EnergiesNew York, NY | Detroit area 50 Ton/day medical waste incineration plant. Owner's engineering services throughout start-up. | 03/91 | 08/92 |
| Jefferson/Belmont Joint Solid Waste Management Plan | Integrated solid waste management plan for multi-county region in Ohio. | 02/91 | 09/92 |
| Inter-Power Corporation Albany, NY | Electrical transmission and interconnection. Feasibility, routing, basic design, specifications, and design review. | 10/90 | 05/91 |
| Kenetech Power Resources 01038-001 |
50 MW combined cycle power plant design and cost estimate | 10/90 | 4/91 |
| Kenetech Power Resources 01038-001 |
50 MW combined cycle power plant design and cost estimate. | 10/90 | 01/91 |
| Tristar Ventures Wilmington, DE | Electrical transmission and interconnection. Provided routing concept, conceptual design and cost estimate. | 09/90 | 01/91 |
| SECORMontreal (Quebec) | Biomass fired 37 MWe cogeneration plant. Feasibility study and EPC cost estimate. | 08/90 | 03/92 |
| AES Transpower Arlington, VA | Study to retrofit and refurbishment of two pulverized coal power plants in Eastern Europe. | 08/90 | 09/91 |
| Killingly Energy Ld. Ptnr. 01034-001 |
Boiler Island study and steam generator specification for conversion to co-generation. | 08/90 | 06/91 |
| SCS EngineersAtlanta, GA | Waste-to-energy study/waste reduction, recycling and composting. | 08/90 | 04/91 |
| Sithe Energies New York, NY | 800 MW pulverized coal fired cogeneration plan. Owner's engineering services permitting and monitoring design. | 08/90 | 03/91 |
| Coastal Power Production Fairfax, VA | Electrical transmission and interconnection. Provided routing concept, conceptual design and cost estimate. | 08/90 | 02/91 |
| Green County Sanitary Engineering Department | Feasibility study for co-composting of sludge and yard wastes and solid waste management plan. | 08/90 | 10/90 |
| Oglethorpe Power Atlanta, GA | Harrison Dam. Provided hydropower economic analysis and business plan. | 07/90 | 11/90 |
| Southern Electric Int'l Atlanta, GA | Florida 250 MWe fluidized bed coal fired cogeneration plant. Conceptual design, basic engineering, & project optimization. | 07/90 | 11/90 |
| Hamilton County-Ohio | Furnished studies and planning of waste-to-energy options for a large metropolitan area. | 06/90 | 03/93 |
| Southern Electric International Atlanta, GA | Master services agreement for miscellaneous proposal support for solid fuel fired projects. | 06/90 | 12/92 |
| Southern Electric International Atlanta, GA | Puerto Rico 300 MWe pulverized coal fired cogeneration plant includes once through cooling & alternate seawater scrubbing. | 06/90 | 07/91 |
| Southern Electric International Atlanta, GA | Florida 300 MWe pulverized coal fired cogeneration plant. Conceptual design, basic engineering & EPC cost estimate. | 06/90 | 07/91 |
| ABB Energy Ventures, Inc. 0519-ODA |
Master Services Agreement enabling ABB to have engineering on call for domestic and international applications. | 05/90 | 12/90 |
| South GA Regional Development Commission | Feasibility Study for a waste-to-energy plan for a four county area including solid waste characterization. | 02/90 | 10/92 |
| Kenetech Power ResourcesWashington, DC | 50 MWe gas fired combined cycle cogeneration plant. Conceptual design and EPC cost estimate. | 02/90 | 10/90 |
| Cook County Commissioners Cook County, GA | Furnish engineering services in connection with the operation and expansion of the Cook County Landfill. | 01/90 | 01/91 |
| Clinton/Warren Solid Waste Management District | Develop a comprehensive solid waste management plan for Clinton/Warren district in accordance with Ohio HB 592. | 01/90 | 11/90 |
| Open | 2000-Present | 1995-1999 | 1990-1994 | 1982-1989 | Top |
| Client | Project Description | Start | Completion |
| Jefferson/Belmont Solid Waste Management District | Develop a solid waste management plan for Jefferson/Belmont district in accordance with Ohio HB 592. | 09/89 | 03/90 |
| Killingly Energy Ld. Ptnr. C01034\001 |
Provide boiler island study and steam generator specifications for 30 MW biomass fueled power. | 08/89 | 08/90 |
| Ultrasystems Fairfax, VA | Electrical transmission and interconnection. Provided routing concept, conceptual design and cost estimate. | 06/89 | 12/89 |
| Inter-Power Corporation Pittsburgh, PA | 80 MWe fluidized bed waste coal fired power plant. Complete design and owners engineering support services. | 05/89 | 11/94 |
| Oxford Energy, Inc. Santa Rosa, CA | Planning of a tire incineration facility in Niagara Falls, NY with throughput of 8.5 t/h and generating 30 MW of electric power. | 04/89 | 05/91 |
| Green County Solid Waste Management District | Develop a comprehensive solid waste management plan for Green County in accordance with HB 592. | 04/89 | 09/90 |
City of Columbus Columbus, Georgia |
Feasibility study for waste-to-energy plan. Landfill investigation design. Recommendations for waste recycling. | 08/88 | 07/90 |
| GA Mountains Area Planning and Development Com. | Feasibility study for waste-to-energy plan for a 10 county area. Solid waste management options. | 07/88 | 08/90 |
| Bluefield Energy Houston, TX | Conceptual design EPC cost for 300 MW fluidized bed waste coal fired power plant. 100 mile 500 KV transmission line. | 04/88 | 06/89 |
| HazWaste Systems, Inc. Atlanta, GA | CAD support for monitoring of contaminated sites. | 02/88 | 05/93 |
| Bartow County CommissionGriffin, GA | Evaluate Bartow county commission proposals for solid waste management. | 10/87 | 1/88 |
| EDA (Gulf & Western) Tampa, FL | 2 MW zinc chloride battery system. Feasibility study, design and project management. | 03/87 | 01/89 |
| Exeter Limited Partnership,Sterling, CN | Sterling, Connecticut 30 MW waste-tire-to-energy project.Specification of facility, evaluation of turnkey proposals. | 08/86 | 12/89 |
| Inter-Power Corporation Albany, NY | 300 MW fluidized bed coal fired power plant feasibility study including environmental impact and return on investment. | 06/86 | 12/87 |
| Oxford Energy, Inc. New York, NY | Planning of a tire incineration plant in New Hampshire with a throughput of 8.5 t/h and generating 30 MW of electric power. | 02/86 | 12/88 |
| Oxford Energy, Inc. New York, NY | Conceptual design of a 800 TPD municipal solid waste incineration waste-to-energy facility for Stanislaus County, CA. | 05/85 | 12/89 |
| Modesto Energy Co. New York, NY | 12 MW waste tire-to-energy plant in Modesto, CA including; specification, bid, design review and site supervision. | 09/84 | 12/88 |
| Blount Energy Corp. Montgomery, Alabama | Norfolk Naval Shipyard: RDF coal-fired waste-to-energy facility with 3 boilers and 3200 MW turbines. | 04/84 | 06/86 |
| Blount Energy Corp. Montgomery, Alabama | 1000 t/day refuse in 2 boiler units with one extraction-condensing turbine of 37 MWe output. | 09/83 | 04/85 |
| Modesto Energy Co. New York, NY | Basic engineering of the facility, consisting of boilers and one condensing turbine, generating 12 MW. | 06/83 | 12/84 |
| Blount Energy Corp. Montgomery, Alabama | 1500 t/day refuse in 3 boiler units with one extraction condensing turbine of 37 MWe output. | 01/83 | 04/84 |
| Blount Energy Corp. Montgomery, Alabama | 2250 t/day refuse in 3 boiler units with 3 extraction condensing turbines having 3 x 20 MWe output. | 03/82 | 04/84 |
| INTER-POWERAlbany, NY | Engineering support services for cogeneration project 5 utilizing fluidized bed boilers | 1989 | 06/92 |